Within the scope of construction of Press and Body Shop buildings of the high-tech electric vehicle production factory of BMW who is one of the world’s leading car manufacturers, which is planned to start production in Debrecen, Hungary in 2025;
- 125.000 m² closed area,
- 10.000 t steel manufacturing and assembly works,
- 60.000 m³ concrete,
- 150.000 m² roof & facade construction works,
- 535.000 m cabling and 110.000 m piping Mechanical, Electrical and Plumbing works are under construction by YM construction.
The works, which started in October 2022, are planned to be completed in a period of 24 months.